National Power Transmission Network Development Project Phase I (2015 - Present)

Project Brief:       
The project objectives are to make a concrete plan for introducing the extra-high voltage power system and to improve DPTSC’s skills for making the plan, design, operation, and maintenance of the extra-high voltage power transmission system. The project included installing 500/230KV S/S at Meikhtila, Taungoo, Pyayargyi, and HlaingTharYar, 500kV transmission line from Phayargyi to HlaingTharYar.   

Client: DPTSC   

Service: Detailed Design, Tender Assistance, Construction Supervision   
 

Sector

Energy

Sector Description

Access to cheap, clean energy is fundamental to the modernization and economic development of any aspiring nation. The study, design and construction of energy facilities especially hydro-electric power stations, is our core strength. We have been involved in hydropower development, the original renewable energy source, since our earliest days and among Japanese engineering firms, we have by far the largest global track record. Not only do we analyze power needs and identify optimal development plans, we also provide all feasibility analysis, design, procurement, and construction management for dams, power stations, and transmission systems.

Sub-sector 
Project name

National Power Transmission Network Development Project Phase I

Project Location and Timeline(2015 ~ Present)
ClientDPTSC
Finance 
ServicesDetail Design, Tender Assistance, Construction Supervision