Yangon Urban Services Improvement Project
Project Brief:
The objective of the project is to improve the urban resilience and livability of Yangon City through two key sub-project.
The replacement of existing open raw water channel from the Ngamoeveik reservoir to the Nyaunghnapin water treatment plant (WTP) and onwards to the Aungtagon pumping station with dedicated raw water transmission pipelines.
Sector | Water |
Sector Description | Water is a major natural resource, which must be supplied in the necessary quantities and of suitable quality to satisfy the demands of residential populations, industrial and commercial development and agriculture. Our services include full water supply cycle from surface and groundwater hydrology, dam and river engineering at source, water treatment, transmission and distribution to sewage collection systems, wastewater treatment and treated effluent disposal and reuse. |
Sub-sector | Water Supply and Sewerage |
Project name | Yangon Urban Services Improvement Project |
Project Location and Timeline | Project location: Yangon Project Period: 2018 - 2019 |
Client | Yangon City Development Committee (YCDC) |
Finance | Asia Development Bank (ADB) |
Services | Feasibility Study, Basic Design, Technical Assistance |