Design and Supervision Consultant for the Work Under Urban Area Power Distribution Improvement Project
Project Brief:
The objective of the Project is to improve the reliability of power supply and reduce distribution loss by repairing and reinforcing the existing 66-kilovolt power distribution substation replacement of distribution wires and introduction of multi-transformer system and utility vehicles, thereby contributing to economic development of Myanmar.
Sector | Energy |
Sector Description | Access to cheap, clean energy is fundamental to the modernization and economic development of any aspiring nation. The study, design and construction of energy facilities especially hydro-electric power stations, is our core strength. We have been involved in hydropower development, the original renewable energy source, since our earliest days and among Japanese engineering firms, we have by far the largest global track record. Not only do we analyze power needs and identify optimal development plans, we also provide all feasibility analysis, design, procurement, and construction management for dams, power stations, and transmission systems. |
Sub-sector | Power System |
Project name | Design and Supervision Consultant for the Work Under Urban Area Power Distribution Improvement Project |
Project Location | Project Location: Yangon, Myanmar Project Period: April 2018 ~ Present |
Client | Yangon Electricity Supply Chain |
Finance | Japan International Cooperation Agency (JICA) |
Services | Detailed Design, Technical Assistance, Construction Supervision |